s forPeanut Butter Grinding Machineinstallation:
1. The equipment should be installed on the flat concrete foundation and fixed with the ground screw (which is not fixed according to the gel grinding work).
2. Check whether the fastening screws are tightened (the rotor center screw is M12 left screw).
3. Use a special trigger to turn the rotor with a special trigger to check whether contact with the stator and whether or not the card is dead. If there is any such situation, the machine should no