date:Aug 19, 2014
na.
Now under construction, the first stage of Sitio 0 will consist of an export terminal with 119,000 metric tons of storage capacity and a high-speed loader with 1,200 metric tons per hour capability at one pier. A planned second stage would include an additional pier and 100,000 metric tons of storage. Sitio 0 has the right to use the Quequen port for 45 years. The first phase is expected to be operational by May 2015.
Necochea is located on the Atlantic Ocean, 528 km (328 miles) southwest