date:May 10, 2013
rted efforts to locate and reduce heat and air losses, corrugated case redesign to maximize cube footprint, installing higher efficiency compressors and decommissioning equipment with less-than-desirable output.
In 2012, production footprints that were found to be inefficient from a material delivery or energy utilization perspective were modified. Production from older, lower-efficiency equipment was moved to newer, higher-cavitation machines. Modification of some shift schedules also helped r