purpose users, please note in advance.
3. Plant construction manual, the equipment layout technology plans, electrical layout, etc. To be sent after signing a contract to pay.
4. To send the guidance of the production line installation and commissioning engineers to guide the location of installation. For the installation to go abroad for staff travel costs and accommodation at the local, transportation and other costs borne by the demand side.
5. The following is not within the scope of supp